top of page

Amendment in the Guidelines for implementation of a scheme for setting up of over 5000 MW Grid-Conne

Amendment in the Guidelines for implementation of a scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phas II of the JNNSM – reg.

For more information please see below link:

https://drive.google.com/file/d/12y2ud3n5ifxntGhk-w9landptHVJavS7/view?usp=sharing


 
 
 

Recent Posts

See All
Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

GET IN TOUCH

We'd love to hear from you

+91 99655 08800

Phone -        +91 99655 08800

Whatsapp- +91 93842 08800

PROPLANET POWER TECHNOLOGIES PVT LTD 

Second Floor, Bharathi Towers,

Opp. SS Kamlesh Kalyana Mandapam, Vadamadurai, Thudiyalur,

 COIMBATORE, TAMIL NADU

PIN Code-  641 017

bottom of page