OUR SERVICES
We undertake solar Rooftop EPC projects for Commercial, Industrial, and Domestic category.
We do Utility Scale Power Projects also.
We do provide Installation and Commissioning Services to leading Solar EPC companies. We are one of the trusted EPC partner for solar projects. Our utmost aim is to deliver the best workmanship quality which must be spoken for the lifetime of the solar plant.
Rooftop Solar?
What We Do in 60 days
01
SITE SURVEY & SITE FEASIBILITY REPORT
5 working days
02
DESIGN AND ENGINEERING
10 working days
03
SOURCING AND TRANSPORTATION
15 working days
04
CONSTRUCTION AND COMMISSIONING
30 working days
100 Kw Industrial tin roof solar plants can be commissioned in 45 working days***
residential
industrial
commercial
utility scale solar power plants
agricultural solar pumping solutions
car port solar
SITE FEASIBILITY SURVEY
There are two basic questions to answer to determine if solar can work well at your location:
Does your location get enough sun?
Do nearby obstacles (trees, buildings, etc.,) at your location block too much sun?
What kind of roof we look for, to put-up a plant
How much of square foot of area available.
We have more questions to ask you to design a profitable solar plant. Call us or mail us for quick survey
DESIGN
&
ENGINEERING
Essentially, this is a plan for the project’s physical development, including the lay-out, identification of equipment, and costs, etc. The system design is often required to obtain permits/consents.
Selecting an initial conceptual design is worthwhile to evaluate various design configurations ie no of modules and its sizes, no of inverter and its capacities, type of inverter String or central inverter. So that a design can be selected and it can be optimised as per the geographical site requirement.
CONSTRUCTION
&
COMMISSIONING
The construction phase of a solar PV power plant should be managed so that the project attains the required standards of quality within the time and cost constraints.
Key project management activities that will need to be carried out, either by the developer or a contractor, include interface management, project planning and task sequencing, management of quality, management of environmental aspects, and health and safety
MAINTENANCE
&
REMOTE MONITORING
Compared to other power generating technologies, solar PV power plants have low maintenance and servicing requirements. However, proper maintenance of a PV plant is essential to maximise both energy yield and the plant’s useful life.
Optimal operations must strike a balance between maximising production and minimising cost.