OUR SERVICES

We undertake solar Rooftop EPC projects for Commercial, Industrial,  and Domestic category.

We do Utility Scale Power Projects also. 

We do provide Installation and Commissioning Services to  leading Solar EPC companies. We are one of the trusted EPC partner for solar projects. Our utmost aim is to deliver the best workmanship quality which must be spoken for the lifetime of the solar plant. 

Rooftop Solar? 

What We Do in 60 days

01

SITE SURVEY & SITE FEASIBILITY REPORT

5 working days

02

DESIGN AND ENGINEERING

10 working days

03

SOURCING AND TRANSPORTATION

 

15 working days 

04

CONSTRUCTION AND COMMISSIONING

 

 

30 working days 

100 Kw Industrial tin roof solar plants can be commissioned in 45 working days***

residential 

industrial

commercial

 

utility scale solar power plants

 

agricultural solar pumping solutions

car port solar

SITE FEASIBILITY SURVEY

There are two basic questions to answer to determine if solar can work well at your location:

Does your location get enough sun?

Do nearby obstacles (trees, buildings, etc.,) at your location block too much sun?

 

 What kind of roof we look for, to put-up a plant

How much of square foot of area available.

 

We have more questions to ask you to design a profitable solar plant. Call us or mail us for quick survey 

DESIGN

&

ENGINEERING

                                   Essentially, this is a plan for the project’s physical development, including the lay-out, identification of equipment, and costs, etc. The system design is often required to obtain permits/consents.

 

 

                    Selecting an initial conceptual design is worthwhile to evaluate various design configurations ie no of modules and its  sizes, no of inverter and its capacities, type of inverter String or central inverter. So that a design can be selected and it can be   optimised as per the geographical site requirement. 

 

CONSTRUCTION

&​

COMMISSIONING

                 The construction phase of a solar PV power plant should be managed so that the project attains the required standards of quality within the time and cost constraints.

 

               Key project management activities that will need to be carried out, either by the developer or a contractor, include interface management, project planning and task sequencing, management of quality, management of environmental aspects, and health and safety

MAINTENANCE

 

&  

REMOTE MONITORING

                 Compared to other power generating technologies, solar PV power plants have low maintenance and servicing requirements. However, proper maintenance of a PV plant is essential to maximise both energy yield and the plant’s useful life.

 

Optimal operations must strike a balance between maximising production and minimising cost. 